| BC Gas
Challenge
BC Gas and BC Hydro wanted to utilize the same CIS solution and
the group needed assistance in investigating the possibilities for
a solution.
Solutions
TMG worked with a combined team from BC Gas and BC Hydro to analyze
alternative Solution to combining the two onto a single CIS solution.
The Peace system had been installed for a subset of BC Gas’
customer base, and BC Hydro was not fond of this system.
Results
BC Gas and BC Hydro could not reach consensus on a single product
for both companies. The study resulted in BC Gas continuing to roll
out on Peace while BC Hydro moved to implement the SAP solution.
Type:
Investor Owned
Client Services: Gas
Accounts Served: 750,000
Population Served: 2.2 Million
Project System: CIS
TMG Services: CIS Evaluation
Vendor Selected: Peace
Project Dates: 01/2001 - 03/2001
Go-Live: 04/2001 |